The Tavşan Gold Mine is located in western Türkiye and is owned by Zenit Madencilik San. ve Tic. A.Ş., a three-way partnership between Ariana Resources (9.9%), Proccea Construction Co. (23.5%) and Özaltın Holding A.Ş. (66.6%). Mining commenced in early 2024, with heap-leach processing commencing in October 2025. Tavşan completed ramp-up to full production capacity during Q2 2026 and is currently operating at its operating rate of approximately 4,000 tonnes per day.

Image
Image
Image

commodities:

Image
Image

2024 Resource:

7.7Mt @1.26g/t Au
311,000 oz Au

EIA received:

2021

read latest information

Scoping Study:

Completed

processing:

Heap-leach

Planned Annual Production:

30,000oz Au

Resource Estimate

Classification   Grade Metal Content
 Tonnage (t) Au (g/t) Ag (g/t) Au (oz) Ag (oz)
Measured 3,763,300 1.35 4.75 163,500 574,900
Indicated 2,418,300 1.21  4.10  94,000 319,100
Inferred 1,468,500 1.13  4.46  53,400 210,400
TOTAL 7,650,100 1.26  4.49  311,000 1,104,400

 


Note: Summary of March 2024 Tavsan Sector Resources classified and reported in accordance with JORC 2012. Reporting is based on a 1.5 g/t Au cut-off grade for high grade domains and a 0.5 g/t Au cut-off grade for all other domains. All figures are quoted gross with respect to Zenit. Figures in the table may not sum precisely due to rounding.

 
A NSR royalty of up to 2% on future production is payable to Sandstorm Gold.